§ 157. Development standards.  


Latest version.
  • Table I Industrial Zone Development Standards

    Minimum lot area 40,000 square feet
    Minimum front yard setback 50 feet
    Minimum side yard setback 30 feet
    Minimum rear yard setback 50 feet
    Maximum building height 50 feet

     

    In the case of a corner lot which abuts any two (2) intersecting streets, the minimum side yard setback for the side of the building or structure facing a street shall be the same as a front yard setback.

    Setbacks are measured from the edge of the right-of-way, or if no right-of-way exists, the setback shall be measured from the actual property line.

(Ord. ( W-8-17 ) of 5-2-17)